Simtel posts revenues of 98.1 million lei and a net profit of 6 million lei in the first half of 2024

Simtel posts revenues of 98.1 million lei and a net profit of 6 million lei in the first half of 2024

simtel_blog_main

Simtel (BVB: SMTL), an engineering and technology group listed on the Main Market of the Bucharest Stock Exchange and a national leader in the renewable energy field, posted, at the consolidated level, operating revenues of 98.1 million lei in the first half of 2024, a 20% decrease compared to the same period last year, and a net profit of 6 million lei, a 9% decrease compared to the first six months of 2023. The decreases recorded in the first six months of 2024 are determined by the company’s transition this year to much larger projects, with a different implementation dynamic, which translates into generating revenues in the second part of the year, as projects are closed and invoiced to beneficiaries.

The first half of the year continued to be a dynamic one for our activity, as we took important steps in the direction of large-scale projects with a significant long-term impact. This transition to larger and more complex projects is essential for consolidating Simtel’s position in the renewable energy market, ensuring that we can meet the growing demands of the sector and our customers. Although the revenues reported for the first six months temporarily reflect a decrease compared to the same period last year, we are confident that the final results for this year will confirm the benefits of our approach. The implementation of much larger projects and the diversification of business lines, along with the expansion of the photovoltaic and energy storage park portfolio, provide us with a solid foundation for future development. Therefore, we continue our mission to develop sustainable projects that contribute to the transition to a greener and more efficient energy system, for the benefit of all stakeholders ,” stated Mihai Tudor, CEO and executive member of the Board of Directors of Simtel Team.

In terms of operating revenues, GES Furnizare SRL, an entity in which Simtel Team S.A. holds a 62% stake, generated operating revenues of 14.5 million lei in the first half of 2024, a remarkable increase considering that 2024 is the company’s first year of operation. Also, in H1 2024, Simtel Solar SRL, an entity from the Republic of Moldova, fully owned by Simtel S.A., generated revenues of 6.5 million lei, due to the closure in the first half of the year of some projects started in 2023.

Regarding the operating revenues generated in H1 2024 by the other entities within the group, Simtel Team S.A generated operating revenues of 79 million lei, ANT Power Energy SRL – 4.7 million lei, Agora Robotics SRL – 1.6 million lei, and Custom Software Solutions – 125 thousand lei.

In the first half of 2024 and subsequently, Simtel signed two significant contracts worth 19 million euros (within a partnership in which Simtel holds 50% of the profits and losses), respectively 66 million lei, for the construction of photovoltaic power plants. Also, after the completion of its own photovoltaic plant in Salonta, with an installed capacity of 5.35 MWp DC (maximum power at the panel level), Simtel signed a PPA (Power Purchase Agreement) contract with GES Furnizare SRL (GES), an entity within the Simtel group, through which it will deliver an annual quantity of 6,500 MWh of electricity to GES. This energy will subsequently be supplied by GES to the final customers in its portfolio.

Regarding the status of its own photovoltaic parks projects, in the first six months of 2024, Simtel acquired two projects in the ready-to-build stage, Salonta and Iacobeni. The photovoltaic park in Salonta is already implemented, and for the one in Iacobeni, with a planned installed capacity of 5.38 MWp DC, the company estimates that it will be implemented during October-November 2024. Currently, Simtel owns seven photovoltaic park projects, which upon completion will have a total installed capacity of over 80 MWp and will generate an annual production of over 107 GWh.

In parallel with the implementation of its own photovoltaic parks, Simtel has also started developing a portfolio of energy storage parks, through which it aims to consolidate its position in the field of renewable energy, these parks representing an essential element in the transition to a sustainable and efficient energy system. Currently, Simtel owns and is developing four energy storage parks with a total capacity of over 90 MWp. The company estimates that some of these will be implemented in the second part of 2025 and during 2026. Energy storage allows balancing the inevitable fluctuations in energy production from renewable sources, ensuring a constant and stable supply to the grid. This contributes to increasing the reliability of energy supply, as well as optimizing long-term costs, through the possibility of using energy at times when the demand for energy is at an extremely high level.

In the first semester of 2024, Agora Robotics, an entity in which Simtel holds a 51% stake, launched the first commercially available autonomous industrial robot developed and produced in Romania, called Sweep. The robot is designed for cleaning hard floors with applicability in warehouses, factories, hotels, commercial spaces, train stations, airports, hospitals, etc. In Romania, the estimated surface area of these spaces exceeds 16 million square meters. Agora Robotics aims to sell the first such robots on the local market by the end of this year. The plan of the Agora Robotics management is that from 2025, the Sweep robot will also be sold internationally.

Simtel Team is listed on the Main Market of the Bucharest Stock Exchange as of August 12, 2024, and is traded under the SMTL symbol.

###

About Simtel

Simtel is a technology, engineering, and innovation group rooted in Romania, with an international presence, and a global vision. The group provides companies and organizations with complete solutions and integrated ecosystems, from consulting, permitting, design, engineering, and construction, to maintenance, operation, measurement, control, and energy supply. The group’s 360° expertise covers the field of photovoltaic power plants, telecommunications, energy storage systems, as well as the development of software platforms and the automation of robotic processes, in order to optimize all resources and increase efficiency. Simtel Team is listed on the Main Market of the Bucharest Stock Exchange under the SMTL symbol.

Stay up to date with our latest updates

The latest news, technology and resources from our team.

Simtel_proiect Giurgiu_11.2025
Simtel inaugurates in Giurgiu Romania’s largest photovoltaic park built through ecological reconversion, with a capacity of 52 MWp

Simtel announces the commissioning of the photovoltaic park in Giurgiu, the largest solar park in Romania built on degraded land, with an installed capacity of 52 MWp and an estimated annual production of approximately 73 GWh.

simtel_echipa_mihai_tudor_cut
Simtel reports revenues of 327 million lei in the first nine months of 2025

Simtel reports consolidated operating revenues of 326.7 million lei in the first nine months of 2025, up 88% compared to the same period of 2024.

Ana Nedea_2
Simtel continues its international expansion by opening a subsidiary in Sweden

Simtel announces the opening of a new subsidiary in Stockholm, Sweden – Simtel Nordics

Simtel_HEPA Energy
Simtel and HEPA Energy to develop one of the largest hybrid photovoltaic and storage projects in Romania, located in Sebeș

Simtel announces the signing of a contract worth approximately RON 217 million (excluding VAT) with HEPA Energy, a company owned by a lead company from Israel. Simtel anunță semnarea unui contract în valoare de aproximativ 217 de milioane de lei (fără TVA) cu HEPA Energy, deținută de o companie-mamă din Israel.

Mihai Velicu_Simtel
Simtel appoints Mihai Velicu as Group Chief Financial Officer

Simtel announces the appointment of Mihai Velicu as Group Chief Financial Officer (CFO). This decision marks a new stage in Simtel’s development, initiating a process of consolidation and organizational structuring designed to ensure the strategic and financial coordination of all the companies within the group.

simtel_echipa_mihai_tudor_cut
Simtel reports revenues of 193 million lei in the first half of 2025

Simtel reports consolidated operating revenues of 192.8 million lei in the first half of 2025, up 81% compared to H1 2024.

Simtel_Climb Again_08.2025
AREVDD and ABB Romania support the Climb Again Center in Nucsoara through a green energy and electric mobility project

The newly installed photovoltaic plant has a capacity of 15 kWp, consisting of 30 solar panels covering an area of 29.3 sqm. It will produce approximately 15.45 MWh of electricity annually, contributing to a reduction of about 7.25 tons of carbon dioxide emissions each year.

Simtel_Verbund
Simtel and VERBUND partner to build a photovoltaic park in Romania with an installed capacity of over 60 MWp

Simtel announces the signing of a significant contract worth approximately EUR 19.1 million (excluding VAT) with VERBUND Wind Power Romania, part of the international VERBUND Group, one of the largest renewable energy producers in Europe.

Ionut Vasilica_G-Energy Solutions
G-Energy Solutions, part of the Simtel Group, targets long-term PPAs for 1 TWh/year from wind and hydro sources

G-Energy Solutions, the new brand under which GES Furnizare operates, part of Simtel, announces the launch of a new strategic green energy procurement program through long-term Power Purchase Agreements (PPAs), targeting a total volume of 1 TWh/year (equivalent to 1,000 GWh/year) from wind and hydro sources. The program includes physical PPAs with durations between 7 and 10 years.

Simtel Team_proiect stocare_MOGAN
Simtel signs an EPC contract worth 169 million lei for the construction of a battery energy storage project

Simtel announces the signing of an EPC (Engineering, Procurement, and Construction) contract with Energy Capital Group, owned by MOGAN Bucharest SRL, part of the GÜRİŞ Group from Turkey, for the implementation of a battery energy storage project.

We are here for any question.